// EGPK · Tower cab · live

Virtual Tower

A stylised look out of the Glasgow Prestwick control tower, with live aircraft, live weather and the kit controllers use. Press What’s this? on any panel to find out what it does, and drag the timeline to see how the tower has changed since 1933.

// Tower through the years

2026 · Today: live from the cab

0 tracks
HDG 304°
Lookinboundoutboundtransitground

Stylised view from the control tower (position from OpenStreetMap; the eye height of about 20 m is an estimate). Runways are drawn from UK AIP threshold data. Elevation is exaggerated; labels are live ADS-B/ground data. Select an aircraft to open its page.

UTC
--:--:--
Local (UK)
--:--
ATIS
121.130
Met display

Weather

NESW
Wind °T
120/19kt
QNH
1002 hPa
Vis
10 km+
Temp/Dew
19/15°C
Cloud
NSC / CAVOK
Runway in use
RWY 12

EGPK 292320Z 12019KT CAVOK 19/15 Q1002

METAR: 10-min mean wind, °true. Runway from the site’s runway-in-use model.
Aerodrome Traffic Monitor

ATM

51015
Flight progress

Strip board

InboundBuff

Empty bay

OutboundBlue

Empty bay

TransitGreen

Empty bay

On the groundGrey (site)

Empty bay

From the site’s ADS-B and ground feed. Not an ATC record.

VCCS

Radio & landlines

Selectedno audio
118.155
TWR · “PRESTWICK TOWER” · DOC 25 NM / 6,000 ft

Listening in: under the Wireless Telegraphy Act 2006 s.48 it is an offence to use radio apparatus, without lawful authority, to get information from a message not meant for you, or to disclose it. This page plays no audio.

AGL

Ground lighting

Intensity (HI stages, CAP 168)
Stop bars (AIP)

Illustrative switches: they light the runway in the view above but don’t reflect the real lighting state.

Light gun

Signal lamp

To aircraft in flight
Cleared to land
On the ground
Cleared for take-off

SERA Appendix 1. *Clearances to land and taxi are given in due course. Steady white has no listed meaning.

Emergency

Crash alarm

ATC alerts the fire service immediately with the fullest information, confirms the aircraft type and passes the surface wind if there’s a fire on the ground.

// 2026

Today: live from the cab

  1. NowAir traffic services H24 on runways 12/30 and 02/20, with ILS CAT I on 12 (IPP) and 30 (IKK), in Class D controlled airspace. [UK AIP AD 2 EGPK (AIRAC 2026-09-03)]
  2. 2026A tender to replace both ILS and the associated DME for RWY 12/30 runs from 8 Jun to 7 Dec 2026. [PCS notice FEB549922 (2026)]
  3. NowHMS Gannet, which arrived in 1971 (ABCT), is on the airfield. [UK AIP AD 2 EGPK (AIRAC 2026-09-03)]

Digital displays are shown as typical of a modern UK cab; Prestwick’s actual equipment makes are not public. Traffic, weather and runway are live.

The control tower at Glasgow Prestwick Airport seen from outside, 2014
The control tower at Glasgow Prestwick Airport, 6 Sep 2014. Walter Baxter · CC BY-SA 2.0 · Wikimedia Commons
Prestwick Airport control tower photographed from below, 2016
Prestwick Airport tower, 2 Sep 2016. Ian Rainey · CC BY-SA 2.0 · Wikimedia Commons
// Explainer

Radar and windfarms

Wind turbines show up as clutter on primary radar. A planning report on a windfarm under the RWY 30 approach rated its effect on Prestwick “Major, Significant”: the clutter sits under the approach, affects RWY 12 departures, and vectoring around it adds track miles. [RWE Enoch Hill 2 EIA Ch 8 (Aug 2023)]

  1. Jan 2015

    Tender for a “Windfarm Radar Mitigation System”

    Published 9 Jan 2015, deadline 10 Feb 2015 (ref. GPA_AENG_001, value not shown). The airport said it “is surrounded by land subject to significant planning applications for wind farm development”, that turbines would generate clutter on the ATC radar display, and that it “does not have a suitable means of mitigating or removing that clutter”. It wanted a “Regional Solution”: 360° to 20 nm, extending to 40 nm over time. Four lots: a wind-turbine-resilient primary radar; a 20 nm PSR expandable to windfarm tolerance at 40 nm by 2017; a Multi Radar Tracker fusing the mitigated data with the existing S511 PSR, SSR/WAM and future ADS-B; and a new radar display system. [PCS notice JAN196696 (2015)]

  2. S511

    The legacy primary radar

    An August 2023 planning report says Prestwick “currently operates a Marconi S511 Hybrid Watchman Model PSR” and has procured a Terma SCANTER 4002 as a potential mitigation, with the S511 continuing until replaced. [RWE Enoch Hill 2 EIA Ch 8 (Aug 2023)] A forum post (unverified) calls it an EN4000, S511 electronics with a Watchman antenna. [PPRuNe forum (unverified)] Its installation date at Prestwick isn’t in the sources we found.

  3. 2019–21

    Terma SCANTER 4002 trials, paid for by developers

    In August 2021 the Sunday Post reported a £5m turbine-tolerant “Scanter” radar, funded by windfarm developers, in final operational trials and due to enter service that summer. The same report said the airport had received more than £8m from windfarm firms over four years; ScottishPower Renewables’ lawyers put it at £8.2m, with £6m ring-fenced for radar upgrades, and accused the airport of unlawfully seeking annual payments, which the airport denied. [Sunday Post, 1 Aug 2021 (via wind-watch.org)] An official in-service date wasn’t found.

  4. Aug–Sep 2023

    Ministers rule out ongoing compensation

    ScottishPower Renewables’ 18-turbine Clauchrie scheme was refused on 31 Aug 2023. [Energy Consents Unit ECU00002001] In September 2023 ministers agreed with a public inquiry that mitigation costs “should be demonstrably incurred by Prestwick Airport and that there is no basis for ongoing compensatory payments”. The airport’s lawyers warned of “significant technical, operational and financial consequences”. It had received £5m in compensation from 2019 to 2021. [The Scotsman, 1 Oct 2023]

  5. Aug 2026

    Replacement radar cleared

    South Ayrshire Council granted a certificate of lawfulness to replace the end-of-life EN4000 primary surveillance radar with a modern equivalent on the same tower, next to the ATC tower and Apron E, as permitted development. Its stated uses: finding non-cooperative traffic, monitoring aircraft whose transponders fail, and watching surface and terminal movements. The make wasn’t named. [Ayr Advertiser, 15 Aug 2026]

How mitigation works

The CAA’s policy on wind turbines, CAP 764 (v7.1, Sept 2026), sets out the options, with detail in CAP 670 SUR 13. [CAA CAP 764 v7.1] [CAA CAP 670]

Blanking

Suppress radar returns in a sector over the windfarm. On most primary radars there is no height, so a blank is “a column at all altitudes”. Blanks must be small enough for aircraft to cross quickly. Micro-blanking uses high-resolution blanks, at the risk of scattered single-scan losses.

CAP 764 2.23, 2.48
Infill radar

A second radar with a clear view over the windfarm supplies data “stitched” into the main picture. If it fails, “the in-filled areas become simple blanks”. Glasgow Airport uses dual Terma SCANTER 4002 infill radars for Kype Muir windfarm.

CAP 764 2.24, 2.48; airport-technology.com, 4 Feb 2019
3D radar

Can provide information above windfarm-affected areas.

CAP 764 2.25
Doppler & spectrum filters

High-PRF/Doppler processing and spectrum filters tell turbines from aircraft by their Doppler signatures.

CAP 764 2.26–2.27
Turbine-tolerant radar

A radar like the Terma SCANTER 4002 maps turbine positions and suppresses their tracks while still tracking aircraft (Pager Power lists 6 m range cells and 1000+ tracks).

Pager Power; Clauchrie EIA snippet (unverified)
Transponder Mandatory Zone

A TMZ removes the need for primary radar in an area, but needs an airspace change under CAP 1616. In controlled airspace, SSR-only service is allowed for the minimum time after a temporary PSR failure.

CAP 764 2.28, 2.48 note
Holographic radar

Aveillant’s Theia 16A staring-array radar was deployed at East Midlands Airport in 2015 for the Spondon windfarm and received CAA operational approval.

airport-information.com, 23 Sep 2016
Planning conditions
A typical Prestwick suspensive condition: no blade fitted and no turbine operated until Scottish Ministers are told by the airport that every measure in the Radar Mitigation Scheme is in place and the CAA has approved it. The scheme covers “equipment, procedural or technological measures”, maintained for the life of the windfarm. [RWE Enoch Hill 2 EIA Ch 8 (Aug 2023)] Prestwick objected to Holy Isle because vectoring would avoid a 5 nm area, then withdrew after further assessment. [Pager Power: Holy Isle]
Beyond the airport
If the Terma is unserviceable, service continues on the NATS Lowther Hill SSR (Clauchrie EIA snippet, unverified). NATS has installed a replacement Indra radar at Lowther Hill, “stated to possess inherent windfarm mitigation”. [RWE Enoch Hill 2 EIA Ch 8 (Aug 2023)] Community Windpower’s consented 44-turbine Sanquhar scheme was shelved on cost after the 2023 decision. [The Scotsman, 1 Oct 2023]

Ownership and figures are as reported in the sources cited (the 2015 notice describes the airport as owned and operated by the Scottish Government). Sources that couldn’t be fully checked are marked unverified.

Credits & sources

Main references: UK AIP AD 2 EGPK (AIRAC 2026-09-03) · CAA CAP 493 MATS Pt 1 · CAA CAP 168 · CAA CAP 746 · CAA CAP 670 · CAA CAP 764 v7.1 · SERA Appendix 1 (UK Reg 923/2012) · Wireless Telegraphy Act 2006 s.48 · ABCT: Prestwick · atchistory: Prestwick Airport. Aircraft positions are from the site’s ADS-B feed; weather is the latest EGPK METAR.

This is an illustrative educational page, not an operational display. It is not affiliated with Glasgow Prestwick Airport or NATS. Where Prestwick-specific details weren’t published, panels show typical UK practice and say so.